Project Management

Purpose

This document defines the end-to-end project management lifecycle for website and web-app development at Wraptron Apptech LLP. It provides phase-by-phase requirements and procedures to ensure predictable, high-quality deliveries.

Definitions & Glossary

  • Deliverable: A tangible output (e.g., sitemap, Figma files, deployed site).
  • MVP: Minimum Viable Product — smallest set of features that delivers value.
  • SLA: Service Level Agreement for uptime, support response times.
  • Change Request (CR): Formal change to scope, timeline, or cost

Process flow

PHASE 0: Definition - Understanding Business Requirement

Business Requirement

  1. Understand the business goals, success metrics, constraints, timeline and budget.
  2. Document purpose,scope of work, target audience, assumptions and risks.
  3. Identify the required pages (Home, Services, Contact, About, etc.) and core features.
  4. Capture functional requirements (e.g., login, cart, forms, events).
  5. Capture non-functional requirements (performance, uptime, security, compliance).
  6. Identify hosting preferences and third-party integrations.(e.g., managed vs self hosted, uptime, performance).

Technical Requirement

  1. Define the proposed technology stack.
  2. Initial Sitemap and page list.
  3. High-level feature list and priority (Must/Should/Could/Won’t).
  4. Rough effort Estimate based on the number of pages, users and functionality.

Acceptance Criteria

  1. Stakeholder sign-off on BRD.

PHASE 1: Project Planning

Project Planning

  1. Break down projects into tasks and milestones (Epics → Stories → Tasks).
  2. Assign owners, estimate effort and set deadlines.

Content Collection

  1. Collect all content and branding assets such as logo, business plan, process maps, brochure, old website, presentations, photos etc.

Prepare Phase 1 Deliverables

  1. Project Plan (Gantt/roadmap) with milestones.
  2. Task board (e.g., GitHub Projects, Jira, Trello) with assigned tasks.
  3. Checklist for Content collection, Onboarding for new team members.
  4. Feasibility report and stakeholder sign-off.

Check for feasibility

  1. Confirm technical feasibility and resource availability.
  2. Finalize stakeholder approval before moving forward.
  3. Final stakeholder approval to proceed.

PHASE 2: User Experience Design

Information Architecture

  1. Define Navigation,menu with Sitemap with URL structure
  2. Define Typography - Text hierarchy, Color Palette and iconography.
  3. Icons, Graphic & text-based content.
  4. Define layout structures for key pages (Homepage, Dashboard, Apphome etc,.).

User Journey Map

  1. Define the target audience
  2. Create user personas and journey maps for primary tasks (e.g., purchase, signup, contact).

Wireframe, User Interface Design (if required)

  1. Create wireframes/mockups for key templates.
  2. High-fidelity mockups in Figma (or lovable).
  3. Design responsive UI components (based on tasks like “UI Design for Cart”, “Services Section”, etc.).

Create creative content and media (if required)

  1. Draft copy per page and calls-to-action.
  2. Create or source imagery, illustrations and videos.

Prepare Phase 2 Deliverables

  1. Personas and user journeys.
  2. Sitemap and navigation map.
  3. Design system or component library (colors, typography, spacing, components).
  4. Wireframes and Figma prototypes (desktop, tablet, mobile).
  5. Content drafts and media assets.

Acceptance Criteria

  1. Usability sign-off from stakeholders.

PHASE 3: Software Development

Setting Up the Development Environment

  1. Choose tech stack for frontend, backend, database and system (e.g. Astro, Next.js using react or svelte, Node/Deno with postgres or mongodb ).
  2. Set up version control system on GitHub and local environment (VS Code, terminal).
  3. Create repositories and branch strategy (main, develop, feature/, release/, prod).
  4. Setup CI/CD pipelines and environment provisioning (dev/staging/prod) with Environment matrix (dev/staging/prod, credentials required)..
  5. Set up build tools, linters, code formatters and other dependencies.
  6. Document environment variables and secrets handling.

Frontend Application Development

  1. Implement responsive layouts and components with HTML, CSS, JavaScript.
  2. Implement client-side interactions and form validations.
  3. Backend Application Development (if required)
  4. Design database schema and models (Postgres, MongoDB, Neo4j as applicable).
  5. Build APIs for dynamic features (contact forms, carts, events).
  6. Implement functions such as authentication, role-based access control and sessions.

Database System Engineering

  1. Create Data abstraction and data models with ER Diagrams.
  2. Setting up Databases with database script or migration script.
  3. Seed database with staging data
  4. Develop User Access Management model.

Network System Engineering

  1. Provision infrastructure (CDN, DNS, TLS), logging, error tracking and monitoring.

Acceptance & Pre-Production plan

  1. Conduct client UAT on staging; log feedback as tickets with priority.
  2. Resolve critical and high-priority items before scheduling production deployment.
  3. Prepare deployment runbook and rollback plan.

PHASE 4: Quality Control and Assurance

Quality Assurance

  1. Define test cases and test plans (functional, regression, security, performance).
  2. Manual QA on supported browsers and devices.
  3. Automated testing: unit tests and integration tests.
  4. Accessibility testing (WCAG checks, keyboard nav, ARIA roles).
  5. QA test reports and bug tracker (with severity & reproduction steps).
  6. Test coverage reports.

Acceptance Criteria

  1. No critical or high severity open defects.
  2. Accessibility issues logged and mitigated to agreed level.

PHASE 5: Deployment

Release

  1. Configure domain, HTTPS (Let’s Encrypt/CA), and DNS records.
  2. Configure CDN, caching headers and Cloudflare as needed.
  3. Set up logging and error tracking (Sentry, LogRocket, etc.).
  4. Setup CI/CD pipelines on platforms like Cloudflare or AWS hosting.

Post-Launch Monitoring

  1. Ensure uptime, analytics tracking, and error logging.

PHASE 6: Automation & Optimization

Performance & Accessibility

  1. Optimize images, implement lazy loading, test responsiveness and caching strategies.
  2. Run Lighthouse audits and iterate on improvements.

SEO Setup (if required)

  1. Implement SEO basics: titles, meta descriptions, structured data, canonical tags.
  2. Configure Google Analytics / GA4 and Search Console.

Mobile Responsiveness

  1. Check for mobile responsive web pages

Documentation

  1. Standard operating procedure, Work Instruction

PHASE 7: Maintenance & Sustain

Security & Bug Fixes

  1. Monitor logs, uptime and security alerts, patch vulnerabilities, backup.
  2. Apply security patches and dependency updates.

Change Request

  1. Handle change requests via formal CR process and impact analysis.
  2. Content updates and feature additions as requested (e.g. dynamic cart, admin panels, newsletter updates).
  3. Regular additions: events, gallery, testimonials.

Maintenance

  1. Maintenance schedule and preventive maintenance checklist.

TL;DR — Wraptron’s 7-Phase Software Application Development Process

At Wraptron, we follow a structured 7-phase project management lifecycle to ensure smooth, high-quality, and on-time delivery:

  • Definition – Understand client goals, scope, audience, and requirements (both functional & technical).

  • Planning – Break down tasks, set milestones, gather content, and confirm feasibility.

  • Design – Create sitemaps, user journeys, wireframes, UI designs, and content drafts.

  • Development – Build frontend & backend, set up databases, integrate APIs, and prepare staging environment.

  • Quality Assurance – Test functionality, performance, security, and accessibility.

  • Deployment – Launch with proper domain, hosting, HTTPS, and monitoring.

  • Maintenance – Handle updates, bug fixes, security patches, and change requests.

This process ensures every Wraptron project is well-planned, user-focused, technically sound, and future-ready.

Let's build something
AMAZING together

Head Office

Address: Alsa Sheridan, 12-B, Sridharan St, Ayyavoo Colony, Aminjikarai, Chennai, Tamil Nadu 600029

Developer Hub

Address: S-23, SIPCOT Industrial park, Pillaipakkam, Tamil Nadu 602105

Sales Office

Address: SP-153 2nd Floor, 9th Ln, near Coffee Day, Ambattur Industrial Estate, Chennai, Tamil Nadu 600058

wraptron logo

Let's start working together

12-B, Alsa Sheridan, Sreedharan Street,
Aminjikarai, Chennai-29, Tamilnadu,
India

©2025 Copyright, Wraptron Apptech LLP. All rights reserved.
Made with in made in love from india